- Concrete Pumps[3]
- Plastic Sheets[4]
- Formwork[10]
- Other Plastic Building Materials[10]
- Prefab Houses[3]
- Plastic Profiles[1]
- Other Boards[2]
- Contact Person : Mr. Li Bing
- Company Name : Zhengzhou Sanli Building Materials Co., Ltd.
- Tel : 86-371-65982080
- Fax : 86-371-69086855
- Address : Henan,Zhengzhou,Room C0077, 3/F, 144 Huayuan Road, Jinshui District
- Country/Region : China
- Zip : 450000
New developed plastic slad formwork for concrete
Advantages of plastic construction formwork for concrete
1. Resist compression
Plastic steel formwork uses PVC hard material as basis material, and add polymer materials to increase the strength. Per square metre of the plastic template can support more than 5000 kilograms' weight , which can sustain various kinds of building load, therefore, it can totally be substitute for traditional square timber and wooden board.
2. Hardy and Sun Tolerant
Plastic template replace wood with plastic, hardy and tolerant, plastic template won't be out of shape while execution of work environment is on the temperature condition of -20°C to 60 °C.
3. Fine Brightness and Smoothness
With no need for release agent, automatic separation of template will achieved when concrete sets. The gap between templates is very small, after mould uploading, modular surface is flat and smooth enough to exceed the technical requirements of as-cast finish concrete template. The gloss finish has exceeded other template, which can promote construction greatly.
4. Recyclable product
Plastic steel formwork can be recycled more than 30 times, service life is as long as more than 10 years. Our company can recycle, waste plastic template can exchange 30% new template.
5. Moldable sizes
Plastic steel formwork overall cohesiveness design makes it can be applied in all kinds of girders, columns, cast-in-place roof, shear wall. The size can be changed at will, column form can be used as girder form, girder also can be used as column form; girder form can be used as cast-in-place roof form whereas cast-in-place roof form can be used as girder and column form.
The standard for construction
Allowed deviation (mm)
Seam between two joining formwork |
Less than 1.5 |
Planar difference between adjacent foemwork |
Less than 1.5 |
Board-surface smooth of assembled foemwork |
Less than 1.5 |
Layout linear dimension of assembled formwork |
Width less than 1.5length blanking controlling |
Diagonal length differ of assembled formwork |
0.001blanking controlling when leave factory |
Wall formwork steel reinforcement dimensions(mm)
Wall thickness | Reinforcementar rangement | Ledge interval | Rally reinforcement interval | Parallel reinforcement interval | Vertical reinforcement interval |
180-200 | Yawing | 400-500 | 800-1000 | 800-1000 | 400-450 |
Above200 | Yawing | 350-400 | 400-500 | 400-450 | 350-400 |
Research and Development
We have more than 20 engineers in our company, and now we have three factories, which is in Zhengzhou. Kunshan and shanghai. SO we have the power to provided your large supplies.
We invested 10% of our total annual revenue onto Research and Development team. And we believe innovation will keep us on top of construction.
Our company supplys pastic steel formwork all the year round, If you are interested in this newly developed recycled plastic template construction, please contact with us with no hesitate! We will never make you disappointed!
New developed plastic slad formwork for concrete