Zhengzhou Sanli Building Materials Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Li Bing
  • Company Name : Zhengzhou Sanli Building Materials Co., Ltd.
  • Tel : 86-371-65982080
  • Fax : 86-371-69086855
  • Address : Henan,Zhengzhou,Room C0077, 3/F, 144 Huayuan Road, Jinshui District
  • Country/Region : China
  • Zip : 450000

2012 plastic construction floor and column formwork using very well in big construction (building material)

2012 plastic construction floor and column formwork using very well in big construction (building material)
Product Detailed
Related Categories:Formwork
1.Want to buy once and use endless? 2.Want to SAVE 30%manhour & 50% amortized cost? You can try PVC construction formwork.

Welcome to check our product detail information!

There are three parts:

1.Product Introduction 

Plastic  concrete construction formwork (building material) is a new kind of building template, which makes a breakthrough in the field, and take a lead in the world. 

 

 It can totally replace traditional wood template and square timber. Our products have characters such as source saving, environment-protection, and low price.

 

This new type of formwork can be recycled perpetually with more than 30 times of turnovers in a life. With wide operation tempreture range, plastic template can be jointed, saw, drilled with complete accessory.

Flateness and smoothness of this template reachs the requirement for exposted concrete template.

With proper of flame resistance, corrosion prevention, wather proof and insulation, our products meet requirements of formwork for rectangle, cube, L, U shaped building elements. It's easy to be installed and removed,

Compared with traditional template system, plastic template will save 30% manhours; improve construction efficiency more than 40% and save more than 50% of amortized cost for construction template, which is a symbol of revolution in construction field.

 

2. Advantages of this template

1.  Press burden: this template is made of PVC rigid plastic and acromolecule materials to enhence its strength. It can bear 900kgs load per m2 . so it is suitable to be used in various construction project.

 

2. Temperature range: this template can be operated in -20 Celsius to 60 Celsius which will not deformed.

 

3.Flat and smooth. The template will saperate easily from concrete when it is concreted without mold release. Two pieces of template can be jointed well, flatness and smoothness of concrete  surface reachs requirement for exposted concrete template.

 

4.Recycled: With more than 30 time of turnover and 10 years life, used and broken plastic template can be recycled and be replaced for 30% new template or can be reprocessed by us who will only charge you processing fees.

 

5.Type can be changed. With rigour structure, plastic template is suitable to be used in various types of cross beam, column, cast-in-place floor and shear wall. Its size can be changed freely.

 

We now have 1220mm*2440mm, 915mm*1830mm, 1000mm*2000mm , it can be cut vertical, traverse and in any other directions. A even larger manufacture base is in construction and more plants will be put in manufacture.

 

3. Project using pvc formwork pictures

2012 plastic construction floor and column formwork using very well in big construction (building material)



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.