- Concrete Pumps[3]
- Plastic Sheets[4]
- Formwork[10]
- Other Plastic Building Materials[10]
- Prefab Houses[3]
- Plastic Profiles[1]
- Other Boards[2]
- Contact Person : Mr. Li Bing
- Company Name : Zhengzhou Sanli Building Materials Co., Ltd.
- Tel : 86-371-65982080
- Fax : 86-371-69086855
- Address : Henan,Zhengzhou,Room C0077, 3/F, 144 Huayuan Road, Jinshui District
- Country/Region : China
- Zip : 450000
HDPE PVC formwork
Hdpe pvc formwork
Use
Hdpe pvc formwork is mainly used in construction and building operations, which is a substitute for wood former, square timber and steel template. It also can be applied in all kinds of girders, columns, cast-in-place roof, shear wall.
Product Instruction
1. Products Name | Concrete formwork |
2. Specification | All size can be available. |
3. Using | Widely using into construction. |
4. Certificate | ISO9001:2000 Approved |
5. Features | 1. Energy saving, environment protection, cycle us 2. Resist compression, smooth and even surface 3. Size transformed |
6. Performance characteristics | 1. SAVE 30% man-hours & 50% amortized cost. 2. Easy to installation 3. Fine Brightness and Smoothness |
7. Construction requirements | 1. Set the formwork base position. 2. When installation the formwork, the same level of fastener should be on the same level. 3. Wall formwork and bolt hole should be relatively straight. 4. Situ concrete beams on the roof, board, when the span is more than 4m, the formwork should be in accordance with the design requirement, when the design is no specific requirement, and the bagging height should be one-thousand to three- thousands. 5. If the structure surface is irregular or an existing formwork can be figured module. |
8. Resist compression | ≥ 5000kgs weight |
9. Resist temperature | -20°C- 60°C |
10. Payment term | T/T 30%deposite 70% before shipment or L/C at sight |
11. Packing | Shrink film or cartons |
12. Productivity | 30000 square meter/month |
13. Unite price/payment | FOB Shanghai, QingDao |
14. Origin | China |
15. Min-order | 20GP |
16. Material | PVC |
Advantages of this template
1. Press burden: this formwork is made of PVC rigid plastic and macromolecule materials to enhance its strength. It can bear 5000kgs load per m2 . Thus it can completely replace wood template and square timber (plastic template = wood template +square timber) and suitable to be used in various construction project.
2. Temperature range: this formwork can be operated in -20 Celsius to 60 Celsius which will not deformed.
3. Flat and smooth. The formwork will separate easily from concrete when it is concreted without mold release. Two pieces of template can be jointed well, flatness and smoothness of concrete surface reaches requirement for exposited concrete template.
4. Recycled: With more than 40 time of turnover and 10 years life, used and broken plastic template can be recycled and be replaced for 30% new template or can be reprocessed by us who will only charge you processing fees.
5.Type can be changed. With rigor structure, HDPE pvc formwork is suitable to be used in various types of cross beam, column, and cast-in-place floor and shear wall. Its size can be changed freely.
HDPE PVC formwork